AFL Hyperscale 10011504 Manual de instalação - Página 8
Procurar online ou descarregar pdf Manual de instalação para Equipamento industrial AFL Hyperscale 10011504. AFL Hyperscale 10011504 16 páginas. Poc level 3 distribution cabinet
Network Cable Preparation and Dressing
Network
Cable
4
Install network cable, minimum 10m overlength (gas block not supplied).
Adjust Network Distribution Cable Tie Point as appropriate
5
Mark off strip point.
8
© AFL Hyperscale. All rights reserved
Gas Block
Use slack loop
for network cable
Strip
Point