Jafar 5320 Operation And Maintenance Manual - Page 13

Browse online or download pdf Operation And Maintenance Manual for Control Unit Jafar 5320. Jafar 5320 15 pages. Ball valves

Jafar 5320 Operation And Maintenance Manual
down, bolt the ball valve between the pipe end flanges. Add more gaskets if the flange to flange gap is too wide.
Pressure test and strength test the pipeline with the valve fully open.
Caution! If the product has mechanical damage, do not install it in the pipeline.
The assembly method is shown in the following figure:
OPERATION AND MAINTENANCE MANUAL
01-2016
13