Jafar 5320 Operation And Maintenance Manual - Page 15

Browse online or download pdf Operation And Maintenance Manual for Control Unit Jafar 5320. Jafar 5320 15 pages. Ball valves

Jafar 5320 Operation And Maintenance Manual
TYPE 5321
1. Valve; 2. Steel pipeline; 3. Joint.
Caution! If the product has mechanical damage, do not install it in the pipeline.
Caution! Keep the cut-off valve closed during the system pressure test.

4.3 OPERATION

The ball valve shall be operated according to all relevant requirements for cut-off valves, i.e. either in fully
open or fully closed positions. Leaving the valve set partially opened (or closed) may result in seal failure. To
ensure full performance, switch the valve periodically (once a year, from fully open to fully closed). Inspect the
anti-corrosion protective coat and the valve to system joints. Protect the valve from mechanical damage and keep
the valve clean.
MAINTENANCE
Exceeding the operating limits of the valve may result in damage that will not covered by the suretyship
granted by the manufacturer.

4.4 OCCUPATIONAL HEALTH AND SAFETY

The ball valves are eligible for the OHS guidelines and recommendation concerning installation of pipelines
and devices for industrial processing stations, heat power plants, other facilities, and eligible for the Polish
Regulation concerning general OHS laws (use of personal protective equipment for hands, legs and head, and
safety garment), especially at work with low or high temperature hazard.
Misuse of this product is prohibited.

5 WARRANTY TERMS AND CONDITIONS

The product assembled, installed and operated in compliance with this Manual is covered by a
commercial warranty from the manufacturer. The warranty terms, conditions and period are specified in the
relevant Warranty Sheet.
OPERATION AND MAINTENANCE MANUAL
01-2016
15