Centrometal Bio-Tec 25 Technical Manual - Page 3
Browse online or download pdf Technical Manual for Boiler Centrometal Bio-Tec 25. Centrometal Bio-Tec 25 17 pages.
![Centrometal Bio-Tec 25 Technical Manual](/uploads/products/server2/2045392/2045392.jpg)
- 1. Technical Data
- 2. Delivery Package
- 3. Additional Equipment
- 4. Cleaning and Maintenance of the Boiler
- 5. Connection to the Chimney
- 6. Boiler Use
- 7. Connection to the Central Heating System
- 8. Boiler Start up
- 9. Boiler Thermal Protection
- 10. Thermal Fuse
- 11. Electric Connection
- 12. Boiler Regulation
Cleaning and mainternance of the boiler
Image 12. - Cleaning of Bio-Tec 25
ZP
GS
CC
Screw
SV
BL
GG
PD
GO
OS
VI
A
DN
DN
OS
DT
ZO
TU
ZP -
Lever for cleaning of flue gas tubes
VT -
Fan
DO -
Bottom openings for cleaning of
VP -
Fan blade
flue gas chamber
NV -
SV -
Middle boiler door
PD -
BL -
Lateral sides of the bottom fire place
VD -
GO -
Top opening for cleaning of
flue gas tubes
DN -
KV -
Fan box
VI -
Screw and nut M8
DT - Turbulator support
DC -
Flue chamber with flue gas tubes
and turbulators
OS -
30
GO
KV
NV
PD
VT VP
Fan flange
DC
DO
DO
Detail A
ZO
DT
TU
OS -
Shaft
TU - Turbulator (4
pcs. for Bio-Tec 25)
Fan flange holder
GS -
Poker for cleaning of bottom refractory
Top back casing cover
stone (chamotte)
Lid of opening forflue gas
CC -
Brush for cleaning of flue gas tubes
box cleaning
GG -
Poker for cleaning of the top chamber
Turbulator holder support
and flue gas passage
ZO - Wire fuse f3 DIN 11024
Shaft
Technical manual Bio-Tec
DIMENSIONS AND BASIC PARTS OF THE BOILER
ST
KR
ZP
Screw M8
(4 pcs.)
GV
PZ
Screw M8
(2 pcs.)
SV
VD
DV
DO
B1
B
ZL
ZZ
DS
BL
LEGEND:
-
KR
Digital boiler regulation
-
GV
Upper boiler door
-
SV
Middle boiler door
ZP
-
Flue gas tube cleaning lever (can be
installed on the left or right boiler side)
-
PZ
Primary and secondary
air opening lid
-
DV
Lower boiler door
-
PL
Inlet
DM
-
Flue gas tube connection
-
VT
Fan
-
PV
Outlet
-
PP
Filling / draining
-
ZL
Sheet metal protecting cover
Technical manual Bio-Tec
Dimensions of the boiler, basic parts
L
PL
TO
60
L1
TV
VT
GO
L2
KA
VD
DC
DO
PP
PV
A1
A
Bio-Tec 35/45
GS
CC
GG
-
KA
Heat exchanger connection - draining to the sewage
TO
-
Thermal safety valve sensor connection
-
TV
Heat exchanger connection - thermal safety valve connection point
-
DO
Cover of the lower openings the flue gas chamber
-
GO
Upper opening for flue gas tube cleaning
-
DS
Lower refractory stone (chamotte) (2 parts)
-
ZZ
Regulation of primary and secondary air
DC
-
Flue gas chamber with tubes and turbulators
-
GS
Poker for cleaning of the lower refractory stone (chamotte)
-
GG
Poker for upper refractory stone (chamotte) and flue gas channels cleaning
-
CC
Flue gas tubes cleaning brush
-
ST
Safety thermostat
-
BL
Lateral sides of bottom chamber
-
RP
(Only for Bio-Tec 25) regulation of primary air
(used in ignition phase)
-
VD
Opening for cleaning the flue gas chamber
DM
Bio-Tec 25
Detail 1. - Flue gas tube
cleaning lever
Detail 3. - regulation of the primary air,
(used in ignition phase)
(Only for Bio-Tec 25), (35/45
do not have regulation button)
RP
Lower opening lid for
Detail 2. -
flue gas chamber cleaning
3