Fujitsu ETERNUS AF250 S2 Site Planning Manual - Page 35
Browse online or download pdf Site Planning Manual for Storage Fujitsu ETERNUS AF250 S2. Fujitsu ETERNUS AF250 S2 38 pages. Hybrid storage systems, all-flash arrays, power synchronized unit
Also for Fujitsu ETERNUS AF250 S2: Configuration Manual (18 pages), Safety Precautions (12 pages)
2.
Rack Installation Specifications
Installable Racks
Installable Racks
This section explains the racks in which the ETERNUS AF can be installed.
Fujitsu Racks
The ETERNUS AF can be installed in a Fujitsu 19-inch rack. For information about whether the ETERNUS AF can
be installed in an EOLed rack or not, contact your sales representative.
Non-Fujitsu Racks
The ETERNUS AF storage systems are developed and their operation is guaranteed on the assumption that they
are installed in Fujitsu 19-inch racks. Since the ETERNUS AF cannot be tested (for cooling and strength) in non-
Fujitsu 19-inch racks, the operations of ETERNUS AF storage systems cannot be guaranteed. Any problem that
may occur by installing the ETERNUS AF in non-Fujitsu racks is not covered by the warranty.
If the ETERNUS AF needs to be installed in a non-Fujitsu rack, the following conditions must be satisfied.
■
Rack Specifications
Use the rack mount kit supplied with the product to install the ETERNUS AF in the rack. The rack specifications
must satisfy the conditions listed below. For rack specifications, refer to the manual for the rack that is used.
Pitch for mounting holes
•
EIA Standard Universal pitch
•
Size for mounting holes
The size of the square holes must be 9mm or more.
Load bearing capacity
•
The load bearing capacity must be equal to or larger than the total weight of the ETERNUS AF.
Unit Installation Area
•
The dimensions of the area shown in
Figure 19
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Site Planning Guide
Copyright 2021 FUJITSU LIMITED
must match the conditions described in
35
Table
20.
P3AG-1812-06ENZ0