Fujitsu ETERNUS AF250 S2 Site Planning Manual - Page 36
Browse online or download pdf Site Planning Manual for Storage Fujitsu ETERNUS AF250 S2. Fujitsu ETERNUS AF250 S2 38 pages. Hybrid storage systems, all-flash arrays, power synchronized unit
Also for Fujitsu ETERNUS AF250 S2: Configuration Manual (18 pages), Safety Precautions (12 pages)
![Fujitsu ETERNUS AF250 S2 Site Planning Manual](/uploads/products/server2/2442951/2442951.jpg)
2.
Rack Installation Specifications
Installable Racks
Figure 19 Unit Installation Area
Front door of the rack
Table 20 Specifications for the Unit Installation Area
Specification
(1)
Rack front space
(Space between the fixed part of the ETERNUS AF on the
front side and the front of the rack)
(2)
Mount bracket length
(Size between each end of the front and rear rack pillars)
(3)
Rack space
(Space between the fixed part of the ETERNUS AF on the
front side and the rear of the rack)
(4)
Rack mount kit installation area
■
Placement Requirements
When determining service areas, refer to the manual of the rack that is to be used.
Make sure to perform the installation according to the placement requirements described in
cations" (page 7)
(1)
(2)
ETERNUS AF
(4)
Rack pillars
and
"Installation Environment" (page
FUJITSU Storage ETERNUS AF250 S2, ETERNUS AF250 All-Flash Arrays Site Planning Guide
Copyright 2021 FUJITSU LIMITED
(3)
Rack rails
Rear door of the rack
Condition
40mm or more
685mm or more
775mm or less
830mm or more
482mm or more
(recommended)
16).
36
"Installation Specifi-
P3AG-1812-06ENZ0