Fujitsu Eternus DX90 S2 Hardware Installation - Page 16

Browse online or download pdf Hardware Installation for Storage Fujitsu Eternus DX90 S2. Fujitsu Eternus DX90 S2 23 pages. Server connection. (fibre channel) for aix
Also for Fujitsu Eternus DX90 S2: User Manual (35 pages), User Manual (42 pages), Manual (18 pages), Instal Setup (20 pages), Configuration Manual Server Connection (13 pages), Configuration Manual (28 pages), Configuration Manual (15 pages), Configuration Manual (38 pages)

Fujitsu Eternus DX90 S2 Hardware Installation

Power On Procedure (1)

The ETERNUS DX S2 systems can be Powered On directly
from the Controller Enclosure
Push the Power Switch
The "Power" LED of the CE switches on
The power on sequence takes about 2 minutes
If everything is OK, the green Ready LED in
the CE and the green Power LED in the DE
switch on
Power O
Fault
O
Active O
Power
Ready
Fault
Maint/ID O
Cache
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
O
O
O
O
15
Copyright Fujitsu Technology Solutions, Release August 2011