Kohler K301 Installation Manual - Page 10
Browse online or download pdf Installation Manual for Engine Kohler K301. Kohler K301 40 pages. 3/4 inch high-flow deck/rim mount bath valve
Also for Kohler K301: Owner's Manual (17 pages), Owner's Manual (14 pages), Owner's Manual (17 pages), Multi-Language Owner's Manual (8 pages)

Spout Supply
Tube
Tee
Measure
Distance
6. Install the Tubing - Rough Deck Installations
Measure the distance from the bottom of the spout supply tube to
the top of the tee.
Add 1" (2.5 cm) to this measurement, and cut a piece of 1/2"
Nom. (5/8" O.D.) copper tubing to fit into the supply tube and
tee port.
Back off the threaded collars as far as possible without removing
them.
Pivot the valve bodies enough to remove the tee and two pieces
of tubing.
NOTE: If the valve body holes are smaller than recommended, it
may be necessary to remove the entire valve body assembly.
Install the tubing into the tee.
Mate the copper tube from the tee with the spout supply tube.
Pivot the valve bodies onto the two pieces of copper tubing.
DO NOT solder at this time.
113969-2-AC
Sleeve
Rough
Deck
A
Mounting
Nut
10
Threaded
Collar
Spout Supply
Tube
Copper
Tee
Tube
Kohler Co.