Kohler K301 Installation Manual - Page 12

Browse online or download pdf Installation Manual for Engine Kohler K301. Kohler K301 40 pages. 3/4 inch high-flow deck/rim mount bath valve
Also for Kohler K301: Owner's Manual (17 pages), Owner's Manual (14 pages), Owner's Manual (17 pages), Multi-Language Owner's Manual (8 pages)

Kohler K301 Installation Manual
3/8" Pipe Plug
Close Hot
8. Check Operation of Valves
WARNING: Risk of personal injury. Wrap a cloth towel
around the pipe plug to prevent water spray. Water will
purge from the supply tube when you remove the plug.
Thread a 3/8" pipe plug into the top of the spout supply tube.
Ensure that the valves are in the closed position. Turn the cold
valve fully counterclockwise. Turn the hot valve fully clockwise.
Turn on the main water supply.
Check the complete installation for leaks with the valves closed
and open.
Repair leaks as needed.
Close both valves and turn off the main water supply.
Carefully loosen the pipe plug to remove pressure.
Thread the pipe plug back into the spout supply tube.
Install the cardboard plaster guards over both valves and the
spout supply tube.
113969-2-AC
Close Cold
12
Kohler Co.