Dell PowerEdge 2550 Rack Installation Instructions - Page 19

Browse online or download pdf Rack Installation Instructions for Laptop Dell PowerEdge 2550. Dell PowerEdge 2550 40 pages. Wake-on-lan (wol) support on dell servers
Also for Dell PowerEdge 2550: Installation Manual (26 pages), Install Manual (32 pages), Configuration Manual (10 pages), Activation Manual (32 pages), Installation Manual (32 pages), Manual (28 pages), Manual (15 pages)

Dell PowerEdge 2550 Rack Installation Instructions
Recommended Tools and Supplies
You need the following tools and supplies to install the system in a two-post
open-frame relay rack:
#2 Phillips screwdriver
3/8-inch nut driver
Masking tape or felt-tip marker pen to mark the mounting holes
Two-Post RapidRails Rack Installation Tasks
Installing a two-post RapidRails rack kit includes the following tasks:
Marking the rack
1
Installing the slide assemblies in the rack
2
Center mount installation
a
Flush mount installation
b
Installing the system in the rack
3
Installing the cable management arm
4
Marking the Rack
Determine where you want to place the bottom of the system.
1
If you are installing other components in the rack, install the heaviest items at the
bottom of the rack.
Place the 2-U template over the front of the rack rails in the desired location.
2
Position the bottom of the template in line with the desired bottom position of the
3
system chassis.
NOTE: If your rack has wide hole spacing, go to step 5. If your rack has universal-hole spacing,
continue with the next step.
Mark the upper- and lower-mounting positions on the vertical rails as shown by the
4
bottom and top V-notches on the sides of the template.
Each 1-U (1.75-inch) vertical space on a rack with universal-hole spacing has three
holes with center-to-center spacing between holes (beginning at the top of a
1-U space) of 0.625, 0.625, and 0.5 inches (see Figure 1-2).
Ra c k In s ta l lati on Gui de
1-13