Dell N1124T-ON Getting Started Manual - Page 16

Browse online or download pdf Getting Started Manual for Switch Dell N1124T-ON. Dell N1124T-ON 27 pages.

Dell N1124T-ON Getting Started Manual

Booting the N1100-ON Series Switch

When the power is turned on with the local terminal already connected, the
switch goes through a power-on self-test (POST). POST runs every time the
switch is initialized and checks hardware components to determine if the
switch is fully operational before completely booting. If POST detects a
critical problem, the program flow stops. If POST passes successfully, valid
firmware is loaded into RAM. POST messages are displayed on the terminal
and indicate test success or failure. The boot process runs for approximately
60 seconds.
You can invoke the Boot menu after the first part of the POST is completed.
From the Boot menu, you can perform configuration tasks such as resetting
the system to factory defaults, activating the backup image, or recovering a
password. For more information about the Boot menu functions, refer to the
CLI Reference Guide.
16
Getting Started Guide