Dell S4100-ON Series Setup Manual - Page 9
Browse online or download pdf Setup Manual for Switch Dell S4100-ON Series. Dell S4100-ON Series 21 pages.
Also for Dell S4100-ON Series: Installation Manual (47 pages), Installation Manual (48 pages), Installation Manual (49 pages)
To install the S4100–ON Series, Dell recommends completing the installation procedures in the order presented in this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the system or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4100–ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this system.
NOTE:
For more information, see the
Topics:
•
Unpack the system
•
Unpack
•
Rack or cabinet installation
•
ReadyRails installation
•
1U Tool-less mount installation
•
Two-post flush-mount installation
•
Two-post center-mount installation
•
Four-post threaded installation
•
S4100-ON Series system installation
•
1U front-rack installation
•
Optics installation
•
Optics removal
•
System power-up
•
After system installation
Unpack the system
NOTE:
Before unpacking the system, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
•
One S4100–ON Series switch
•
One RJ-45 to DB-9 female cable
•
Two sets of rail kits, no tools required
•
Two PSUs
•
Three or four fan units
•
Two country- and region-specific AC power cords
•
Dell Networking S4100–ON Series Setup Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
S4100–ON Series installation
Open Networking Hardware Diagnostic Guide .
S4100–ON Series installation
3
9