EarthStone pagw 110 Installation, Operation And Maintenance Instructions - Page 14
Browse online or download pdf Installation, Operation And Maintenance Instructions for Oven EarthStone pagw 110. EarthStone pagw 110 17 pages. Gas fired oven
Also for EarthStone pagw 110: Dimensional Drawing (2 pages), Installation, Operation And Maintenance Instructions (18 pages)
EARTHSTONE OVENS PRE-ASSEMBLED GAS OVEN INSTALLATION INSTRUCTIONS
IMPORTA T: PLEASE READ
FOR GAS FIRE OR GAS/WOOD COMBINATION OVENS ONLY
Combustion air intake procedures and installation
Proper installation:
Air flow
Gas Burner system
Improper Installation:
1) No air intake opening for burner
Air flow
In this case a 24"x24" opening will be needed for proper air combustion.
Roof
Air flow
False Ceiling
24"x24" opening needed for
combustion air. Only one intake
should be installed located in the
front or back of oven.
Air flow
Roof
Air flow
Ceiling
Blocked air intake
Air flow
Roof
Air flow
Gas Burner system
14
Air flow
False Ceiling
24"x24" opening needed
for combustion air. Only
one intake should be
Air flow