EarthWay 2170 Assembly Instructions Manual - Page 7

Browse online or download pdf Assembly Instructions Manual for Spreader EarthWay 2170. EarthWay 2170 10 pages. Commercial broadcast spreader with side spread control
Also for EarthWay 2170: Assembly And Operating Instructions Manual (6 pages), Assembly And Operating Instructions Manual (8 pages), Operating Instructions Manual (8 pages), Assembly Instructions Manual (12 pages), Assembly And Operating Instructions Manual (6 pages)

EarthWay 2170 Assembly Instructions Manual
Assembly and Operation Instructions
CALIBRATION
Pull lever back to setting "30" as
Step 15:
shown. Next push pivot & bracket forward so
that the shut off plate in the hopper is in the full
open position. REMEMBER SETTING "30" ON
THE FLOW CONTROL LEVER MUST PLACE THE
SHUT-OFF PLATE IN THE FULL OPEN POSITION
TO BE PROPERLY CALIBRATED. Now tighten the
nuts against the PIVOT BRACKET to prevent
change in calibration.
NOTE: Tension on the flow control lever may
be adjusted by tightening or loosening the
tension nut as shown.
Insert agitator to pinion shaft on
Step 16:
inside of hopper.
Note: the position of flat side of the agitator.
This pin should be installed as shown.
2170_M52164_RevJune2021
PAGE 7