Miele DA 219-2 Operating And Installation Instructions - Page 38
Browse online or download pdf Operating And Installation Instructions for Ventilation Hood Miele DA 219-2. Miele DA 219-2 44 pages. Ventilation system
Also for Miele DA 219-2: Operating And Installation Instructions (40 pages)
Installation
^ Screw the extension piece firmly to
the upper retaining plate using two
3.9 x 7.5 mm screws.
^ Cover the screws with the supplied
cap covers.
^ Only for recirculation:
With the slats pointing downwards,
install the recirculation vents through
the extension piece and into the
diverter.
38
Attaching the chimney
^ Fold the protective shield at the top.
^ Remove the adhesive backing from
the shield.
^ Stick the shield to the chimney
extension so that it is smooth and
flush with the bottom.
^ Remove the protective foil from the
chimney.
^ Remove the backing from the
adhesive strips on the protective
shield.
^ Attach the protective shield to the
front of the chimney so that it
protrudes slightly below the bottom
edge.