Miele DDG 102 Installation Instructions Manual - Page 12
Browse online or download pdf Installation Instructions Manual for Ventilation Hood Miele DDG 102. Miele DDG 102 28 pages. External motor roof installation
Also for Miele DDG 102: Operating And Installation Manual (24 pages), Operating And Installation Instructions (28 pages), Installation Instructions Manual (28 pages)
Installation
Make a 185 mm hole in the wall.
Push the telescopic wall pipe into the
hole so that it is sitting flush.
The telescopic wall pipe will make it
easier to feed the control cable and
the flexible ducting through later on.
Position the motor unit fixing bracket
on the outside wall. The control cable
connection must be at the bottom.
Mark the position of the three holes
to be drilled.
Drill three 8 mm holes and insert
S8 wall anchors in the holes.
12
Connect the three mountings through
the fixing holes in the bracket as
illustrated.
Position the bracket onto the outside
wall again and feed the control cable
with the six-pole connectors through
the telescopic wall pipe into the
house.
If equipotential bonding is required,
pull the earth cable through the hole
provided.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").