Miele DDG 102 Installation Instructions Manual - Page 14
Browse online or download pdf Installation Instructions Manual for Ventilation Hood Miele DDG 102. Miele DDG 102 28 pages. External motor roof installation
Also for Miele DDG 102: Operating And Installation Manual (24 pages), Operating And Installation Instructions (28 pages), Installation Instructions Manual (28 pages)
Installation
DDG 102
The DDG 102 is designed for
installation on an angled tile, slate or
shingle roof. The slope of the roof must
be at least 22° to prevent the ingress of
the elements, such as rain or snow.
Consult a roof tiler or roof plumber for
advice regarding other types of roofing.
Installation on a flat roof is not
possible.
Installation must only be carried out
by a qualified and competent person.
The external motor is connected to the
rangehood by means of a control cable
and is operated by the controls on the
rangehood.
14
Please refer to the operating and
installation instructions for the
rangehood before installing the
external motor and ducting.
The ducting collar on the external motor
has a diameter of 125 mm when the
appliance is supplied.
If exhaust ducting with a diameter of
150 mm is required, the front ring
of the collar must be cut at the join
with a sharp knife.