Miele DDG 102 Installation Instructions Manual - Page 16

Browse online or download pdf Installation Instructions Manual for Ventilation Hood Miele DDG 102. Miele DDG 102 28 pages. External motor roof installation
Also for Miele DDG 102: Operating And Installation Manual (24 pages), Operating And Installation Instructions (28 pages), Installation Instructions Manual (28 pages)

Miele DDG 102 Installation Instructions Manual
Installation
 Remove the roofing around the
installation area.
 Bend the flashing  upwards.
 Position the motor unit on the roof
with the air outlet directed down the
roof.
 Secure the motor unit to the roof
substructure with the fixing plate .
 Replace the roofing. Press down on
the flashing to ensure that it creates a
proper seal.
The flashing should be fitted under
the roofing at the top of the motor
unit and above the roofing at the
sides and bottom of the motor unit.
 If equipotential bonding is required,
connect the earth lead to the earthed
connection point  in the housing.
Equipotential bonding is required if
the control cable is to be extended
by more than the length of the
extension cable supplied (see
"Electrical connection").
16
 Push the flexible ducting onto the
connection on the motor unit and
secure it with a hose clip.
 Connect the control cable plug
connectors.
 Use the extension cable supplied to
lengthen the control cable if
necessary.
When feeding the cable and the
exhaust ducting through the
substructure of the roof, be careful to
ensure that any gaps are sealed
properly afterwards.