ABB ACH580-01 Series Quick Installation And Start-Up Manual - Page 11
Browse online or download pdf Quick Installation And Start-Up Manual for Industrial Equipment ABB ACH580-01 Series. ABB ACH580-01 Series 17 pages. Base drive replacement
Also for ABB ACH580-01 Series: Manual (16 pages), Instructions Manual (8 pages), Instructions Manual (7 pages), Quick Installation And Start-Up Manual (17 pages), Quick Installation And Start-Up Manual (17 pages)
3.
Select Commission the drive and press
4.
Select the localization you want to use and press
5.
To complete the first start assistant, select the values and settings
when prompted by the assistant. Continue until the panel shows that
the first start is complete.
When the panel shows that the first start is complete, the drive is ready
for use. Press
(Done) to enter the Home view.
6.
The Home view shows the values of the selected signals.
7.
After the additional adjustments, make sure that the actual I/O wiring
matches the I/O use in the control program. In the Main menu, select I/
O and press
(Select).
(Next).
(Next).
11