ALLpaQ Packaging Group Genesis 250 C Operator User Manual - Page 9

Browse online or download pdf Operator User Manual for Packaging equipment ALLpaQ Packaging Group Genesis 250 C. ALLpaQ Packaging Group Genesis 250 C 13 pages.

ALLpaQ Packaging Group Genesis 250 C Operator User Manual
2.6 Moving the container to storage area
Pallet base allows for four way entry provided the manual handling equipment used is either a
pallet jack or fork lift truck (See Fig 1.1 and 1.2 above). Material handling equipment with forks
lifting from the legs (1.6, Fig 6.2) ensure two way entry is used when lifting from front or rear of the
base.
2.7 Emptying the container
Move container into position in line with previous instructions (see 1.6).
2.8 Removing the lid
When removing the lid please refer to instruction 1.2.
2.9 Connect bag outlet
Connecting bag please refer to previous instructions (see 1.9)
2.10 Removal of the bag
Removing the bag please refer to previous instructions (see 1.10)
2.11 Folding the container
Fig 11.1
Fig 11.3
On the side panel insert fingers lift panel and fold inwards (Fig 11.3)
Repeat process for opposite panel (Fig 11.4).
Replace lid using ensuring black handles are in open position first (Fig 1.5).
2.12 Moving the container to storage
Pallet base allows for four way entry and two entry dependent upon manual handling equipment.
For detailed information please refer to instruction at (See 1.6)
Fig 11.2
Fig 11.4
Fig 11.4
Manual V1 - (Sept 14
Remove the lid and ensure
the container is empty.
Locate fingers onto the blue
door catches and depress
towards the centre of the box
(Fig 11.1)
Fig 11.5
th
2012)
Allow the panel to fold
inwards and rest on the
base of the container
(Fig11.2).
Repeat this process for
the opposite rear panel.