ABB CPS6000 Quick Start Manual - Page 5
Browse online or download pdf Quick Start Manual for Industrial Equipment ABB CPS6000. ABB CPS6000 6 pages.
Also for ABB CPS6000: Quick Start Manual (8 pages)
QUICK START GUIDE
Step A1 - Set Shelf Address Jumpers on Bottom Shelf
Step A2 - Mount Shelves per main Step 1
Step A3 - Install Shelf to Shelf Signal Cable
Step A3 - Proceed with installation from main Step 2
•
Specifications and ordering information are in the Slimline Power System Ordering
Brochure available at
•
External Surge Protective Device (SPD) is required on all AC inputs.
Equipment Safety is Approved in IEC 60664-1 Installation Category II environments.
•
Equipment and subassembly ports: 1. are suitable for connection to intra-building or unexposed wiring or cabling;
•
Grounding / Bonding Network – Connect to an Isolated Ground Plane (Isolated Bonding Network) or an Integrated
Ground Plane (Mesh-Bonding Network or Common Bonding Network).
•
Installation Environment - Install in Network Telecommunication Facilities, OSP, or where NEC applies.
•
Battery return may be either Isolated DC return (DC-I) or Common DC return (DC-C).
Reference Documents
These document s are available at
Page 5
© 2021 ABB. All rights reserved.
2. can be connected to shielded intra-building cabling grounded at both ends.
abbpowerconversion.com