3B SCIENTIFIC PHYSICS 1000762 Instruction Manual - Page 6

Browse online or download pdf Instruction Manual for Laboratory Equipment 3B SCIENTIFIC PHYSICS 1000762. 3B SCIENTIFIC PHYSICS 1000762 18 pages. Pendulum rod with angle sensor

Fig. 1 Calibration of output voltage,
A: Ruler
5.3 Calibration of output voltage
In order to evaluate the experiment results quan-
titatively, it is necessary to know the precise rela-
tionship between the output voltage and the an-
gle of deflection.
Determine the angle of deflection geometri-
cally with the help of a ruler (see Fig. 1) and
match this with the corresponding output volt-
age.
5.4 Coupled pendulums
To set up a coupled pendulum arrangement (see
Fig. 2), it is necessary to use a second rod pen-
dulum, a coupling spring and a second voltage
sensor with adapter.
The following equipment is needed:
2 Rod pendulums
1 Coil spring, 3.3 N/m
2 Bench clamps
2 Stand rods, 1000 mm
1 Stand rod, 470 mm
4 Universal clamps
2 Voltage Sensors 10 V
2 Adapters, BNC Plug/4 mm Jacks
1 Data logger
1 Software
More information about digital measurement can
be found on the product's webpage in the 3B
Webshop.
Set up both pendulums as described in step
5.1.
You can increase the stability of the set-up by
adding a short stand rod between the two
long ones.
3B Scientific GmbH ▪ Ludwig-Erhard-Straße 20 ▪ 20459 Hamburg ▪ Germany ▪ www.3bscientific.com
Fig. 2 Coupled pendulums
1000764
1002945
1002832
1002936
1002934
1002830
1021682
1002750
Subject to technical amendments
© Copyright 2023 3B Scientific GmbH
Insert the ends of the coil spring
in the pendulum rods to couple the two pen-
dulums
together.
6. Disposal
The packaging should be disposed of at local
recycling points.
Should you need to dis-
pose of the angle sen-
sor, never throw it away
in
normal
domestic
waste. Local regula-
tions for the disposal of
electrical
equipment
will apply.
into the holes