HP StorageWorks 8B - FC Entry Switch Installation Instructions Manual - Page 16

Browse online or download pdf Installation Instructions Manual for Switch HP StorageWorks 8B - FC Entry Switch. HP StorageWorks 8B - FC Entry Switch 20 pages. Fabric os release notes version 3.0.1b
Also for HP StorageWorks 8B - FC Entry Switch: Update Manual (9 pages), User Manual (22 pages), Firmware Release Notes (14 pages), Installation Manual (14 pages), Release Note (26 pages), Manual (50 pages), User Manual (44 pages), User Manual (44 pages), User Manual (38 pages), User Manual (38 pages), User Manual (37 pages), User Manual (30 pages), Release Note (16 pages)

HP StorageWorks 8B - FC Entry Switch Installation Instructions Manual
Note:
rails. Each switch requires a different number of these screws. For example,
shows the an inner rail being attached to the SAN Switch 2/16 with five screws.
Attaching both inner rails requires ten screws.
Figure 7: Assembling the inner rails
Note:
screw with thread lock and torque between 6 to 8 inch-pounds.
16
a. Assemble the two inner rails (one on each side) to the switch using the
appropriate number (from
screws as shown in
The rail kit provides fourteen #8-32 x 3/16-inch screws for assembling the inner
For factory integration only, tighten the #8-32 x 3/16-inch Phillips pan-head
step
5) of #8-32 x 3/16-inch Phillips pan-head
Figure
7.
SAN Switch Rack Mount Kit Installation Instructions
Figure 7