Archer Components D1X Installation And Configuration Instructions
Browse online or download pdf Installation And Configuration Instructions for Bicycle Accessories Archer Components D1X. Archer Components D1X 2 pages.
MODES OF OPERATION
BATTERY CHECK
When the shifter powers on the battery level is displayed by the LED.
• Solid green = >50%
• Flashing green = 30% -- 50%
• Solid red = 15% -- 30%
• Flashing red = <15%
When shifter is in Run mode, press the tactile switch to display battery level.
RUN MODE FEATURES
Normal:
• Green flashing LED
• Auto-shutdown accelerometer running
• Get me home gear enabled
Low power mode:
• LED connection and battery indicators shown for 10 seconds after power on
or tactile button press. Otherwise the LEDs are shut off
• No auto-shutdown accelerometer
• No get me home gear
SEARCH MODE
• When the shifter is not connected to a device (app or remote) the LED will
flash red. The shifter is waiting for a device to connect to.
LEARN MODE
LED flashes orange.
Shifter is in learn mode when "Pair Remote" is pressed in the app.
• Once "Pair Remote" is pressed the shifter will power down immediately.
• Press the tactile switch for 1 second to power on the shifter, it will now be in
Learn Mode.
• While in Learn mode, the shifter is searching for an available device to
connect with. Once connected the shifter will record the UUID of the device
in memory and only pair with this device.
• While the shifter is in Learn Mode, turn on the remote and the two devices
will pair and store the UUID in memory.
MICRO-ADJUST MODE
1. While in Run Mode press and hold the shifter tactile switch for 3 seconds.
2. The LED will flash alternating green and red lights.
3. Shift up and shift down buttons on remote will micro adjust current gear set point.
4. Press the tactile switch quickly to exit Micro-adjust mode and return to Run Mode.
Questions? Email [email protected]
A R C H E R C O M P O N E N T S . C O M
I NS TALLATION & CON FIG URATION IN STRUCTION S
STEP 1: CHARGE BATTERIES
Charge the AA and AAA batteries completely before installation using the provided charger.
STEP 2: SHIFTER INSTALLATION
Bike Preparation
1. Shift to smallest gear on rear cassette.
2. Remove rear wheel.
3. Disconnect the shift cable from the rear derailleur and pull bowden housing and ferrule
free from rear derailleur.
Shifter Prep - Batteries
1. Remove the M2 screw holding the battery door cover closed.
2. Insert the two 3.7V li-ion rechargeable AA size batteries into the battery channel, positive
end first.
3. Do not use alkaline AA batteries. Although they are the same size, they run a much lower
voltage and the shifter will not perform well.
4. Close the battery door and tighten the M2 screw.
Shifter Prep - Shift cable
1. Locate the shifter along the chainstay and measure the cable and bowden housing
lengths you will need for your bike. Keep it as straight as possible.
2. Peel back the silicone housing to expose the maintenance hatch.
3. The drive nut should be as close to the ferrule side of the shifter as possible. If not,
power on the shifter, pair with the app, and go to "Settings > Change Shift Cable."
4. Insert the desired length of shift cable into the drive nut and thread it out the ferrule hole
on the shifter.
5. Affix ferrules to the bowden housing and slide the shift cable through. Fit the shifter end
ferrule into the hole on the shifter.
6. Pull the shift cable snug against the drive nut and take care that the barrel of the shift
cable is not caught on the small metal tab on the drive nut.
7. Re-affix the silicone cover over the maintenance door.