ABB C1900 Series Operating Manual - Page 10

Browse online or download pdf Operating Manual for Measuring Instruments ABB C1900 Series. ABB C1900 Series 20 pages. Circular chart recorder and recorder/controller
Also for ABB C1900 Series: Installation Manual (20 pages), User Manual (20 pages), Operating Instructions Manual (12 pages), Installation Manual (20 pages), Installation Manual (16 pages)

ABB C1900 Series Operating Manual
...4 OPERATION
The instrument has dedicated
monitoring of the process measurements and are not affected by the security system which inhibits access to the
only – see Section 4.5 on page 12.
LEVELS
4.1 Input Error Messages – Fig. 4.2
Message
Ad. F AIL
Internal analog to digital converter system hardware has failed
Input is above or below fault detection level.
F–INPt
or
Input exceeds the limits for the linearizer selected
Examples
Ad. F AIL
200. 5
Note. Error messages are cleared automatically when the fault condition no longer exists.
8
in the
Operating Pages
OPERATOR LEVEL
Reason
Hardware failure on
Process Variable 1
Fig. 4.2 Input Error Messages Displayed in the Operating Page
– see Sections. 4.1 to 4.4. These pages are used for general
• Check that the input/output board is located correctly
in its socket.
• Power down and up
If the 'Ad. F AIL' message is still present, contact the
local service organization
• Check input source for possible broken sensor
• Check input connections
• Check input link position
• Check input configuration in
200. 5
F–INPt
Input out of range on
Process Variable 4
PROGRAMMING
Action
Set Up Input Page