Cisco 3750 - Catalyst EMI Switch Getting Started Manual - Page 21

Browse online or download pdf Getting Started Manual for Switch Cisco 3750 - Catalyst EMI Switch. Cisco 3750 - Catalyst EMI Switch 33 pages. Catalyst 3750 series switches
Also for Cisco 3750 - Catalyst EMI Switch: Datasheet (18 pages), Installation Manuallines (47 pages), Faq (10 pages), Product Bulletin (5 pages), Product Support Bulletin (6 pages), Product Overview (25 pages), Description (1 pages), Datasheet (23 pages), Product Support Bulletin (6 pages), Getting Started Manual (27 pages), Datasheet (23 pages)

Cisco 3750 - Catalyst EMI Switch Getting Started Manual

Install the XENPAK Module and Connect to the Ports

Follow these steps to install
Catalyst 3750G-16TD switch:
Step 1
Remove the two Phillips-head
retaining screws from the XENPAK
module slot cover, and store them for
later use. Remove the cover.
Step 2
Align the XENPAK module with the
guide rails inside the module slot, and
slide the module into the slot until the
XENPAK faceplate is flush with the
switch faceplate.
Step 3
Secure the XENPAK module in place by tightening the two captive installation screws.
Do not overtighten the screws.
Step 4
Remove the rubber plugs from the XENPAK module ports and fiber-optic cable, and
store them for future use.
Step 5
Align the cable SC connector with the
XENPAK module connector, so that
transmit (TX) meets receive (RX),
and RX meets TX.
See the "Verify Port Connectivity" section on page 20 for instructions on how to verify that the
XENPAK module ports have established a link to the external device.
a XENPAK module into the XENPAK module slot on the front panel of the
TX
RX
Rubber
XENPAK
plug
module
C at al ys t 37
50
se rie s
1
C at al ys t 37
50
se rie s
1
C a ta ly st 3
7 5 0
se ri es
1
T X
R X
XENPAK
module
21