Siemens SINAMICS G120 Getting Started - Page 36

Browse online or download pdf Getting Started for Industrial Equipment Siemens SINAMICS G120. Siemens SINAMICS G120 46 pages. Using blocksize converters in marine applications
Also for Siemens SINAMICS G120: Operating Instructions Manual (32 pages), Getting Started (30 pages), Hardware Installation Instructions (2 pages), Installation Instructions And Owner's Manual (2 pages), Installation Instructions (2 pages), Installation Instructions (2 pages), Compact Operating Instructions (32 pages), Manual (42 pages), Getting Started (50 pages), Device Manual (34 pages), Quick Install Manual (2 pages), Application Description (50 pages), Compact Operating Instructions (2 pages), Manual (31 pages), Applications Manual (34 pages), Compact Operating Instructions (2 pages), Compact Operating Instructions (2 pages)

Siemens SINAMICS G120 Getting Started
Commissioning
4.2 Commissioning with STARTER
4.2.3

Configuring a drive

The basic commissioning of the inverter comprises the following steps:
1. Starting basic commissioning
2. Configuring a drive
3. Loading the configured data into the drive
Starting basic commissioning
Procedure
To start the basic commissioning, proceed as follows:
1. In STARTER select the drive you wish to commission.
2. Start the wizard for the device configuration:
You have started the basic commissioning.
Configuring a drive
Procedure
To configure the drive, proceed as follows:
1.
36
Select the required
function modules
for your
application.
Select the control
mode.
Converters with CU250S-2 Control Units
Getting Started, 10/2013, FW V4.6, A5E32899990B AA