Siemens SINAMICS G130 Operating Instructions Manual - Page 27

Browse online or download pdf Operating Instructions Manual for Industrial Equipment Siemens SINAMICS G130. Siemens SINAMICS G130 46 pages. Line filter
Also for Siemens SINAMICS G130: Operating Instructions Manual (24 pages), Operating Instructions Manual (26 pages), Operating Instructions Manual (46 pages), Operating Instructions Manual (24 pages), Operating Instructions Manual (31 pages), Operating Instructions Manual (30 pages), Operating Instructions Manual (28 pages), Operating Instructions Manual (30 pages), Operating Instructions Manual (22 pages), Operating Instructions Manual (28 pages), Operating Instructions Manual (30 pages), Operating Instructions Manual (34 pages), Operating Instructions Manual (46 pages), Operating Instructions Manual (26 pages), Operating Instructions Manual (26 pages), Operating Instructions Manual (28 pages), Operating Instructions Manual (42 pages), Operating Instructions Manual (46 pages), Operating Instructions Manual (24 pages), Operating Instructions Manual (24 pages), Operating Instructions Manual (30 pages), Operating Instructions Manual (42 pages), Operating Instructions Manual (38 pages), Operating Instructions Manual (28 pages), Operating Instructions Manual (22 pages), Operating Instructions Manual (24 pages)

Siemens SINAMICS G130 Operating Instructions Manual
Figure 4-3
Connection
When connecting the dV/dt reactor and Voltage Peak Limiter, you must take into account the
following conditions to ensure that it functions correctly:
● Control cables must be routed separately from power cables. Power cables are the motor
● It is recommended to use shielded motor cables. If a shielded motor cable is used, its
● The ground wire for the motor must be fed directly back to the Power Module.
dV/dt filter plus Voltage Peak Limiter
Operating Instructions, 03/2012, A5E00692302A
Interface overview, voltage peak limiter, type 3
cable or the connecting cables from the DC link of the Power Module (terminals
DCPS/DCNS) to the Voltage Peak Limiter. In particular, you must ensure that control
cables and power cables are not routed in parallel in a joint cable raceway, even if all the
cables are shielded.
shield should be in face-to-face contact with the shield plate and motor housing.
Electrical installation
25