Siemens UROSKOP D Additional Installation, Operation And Maintenance Instructions - Page 18

Browse online or download pdf Additional Installation, Operation And Maintenance Instructions for Industrial Equipment Siemens UROSKOP D. Siemens UROSKOP D 26 pages.

Siemens UROSKOP D Additional Installation, Operation And Maintenance Instructions
2 - 10
2.5.2

Tilt drive

PMP
Linear bearing
Lightly grease the linear bearings with LONGTIME PD2.
PMP
Bearing track of the tilt function
Lightly grease the bearing track with LONGTIME PD2.
PMP
Tilt spindle
Lightly grease the tilt spindle with LONGTIME PD2.
PMP
Ball bearing guides
Lightly grease the ball bearing guides with LONGTIME PD2.
PMP
Toothed gears
Lightly grease the toothed gears of the potentiometer drive (r103), with LONGTIME PD2.
2.5.3

Rotation drive

PMP
Spindle (Uroskop D2/D3 only)
Grease the rotation drive spindle with LONGTIME PD2.
2.5.4

Longitudinal table drive

PMP
Rails
Clean the guide rails and lightly grease them with silicon paste.
2.5.5

Spotfilm device

PMP
Cleaning
Clean the entire spotfilm device inside, where accessible.
2.5.6

System general

PMP
Contrast agent residues
Remove any contrast agent residues and other contamination from points on the system
normally not accessible to the customer.
PMP
Cables and hoses
Clean all accessible cables and hoses.
UROSKOP D
Inspection and maintenance
RLL5-310.101.02
Page 10 of 16
Rev. 02
01.97
TDSP 1
Siemens AG
Medical Engineering