Siemens UROSKOP D Instruções adicionais de instalação, operação e manutenção - Página 18
Procurar online ou descarregar pdf Instruções adicionais de instalação, operação e manutenção para Equipamento industrial Siemens UROSKOP D. Siemens UROSKOP D 26 páginas.
2 - 10
2.5.2
Tilt drive
PMP
Linear bearing
•
Lightly grease the linear bearings with LONGTIME PD2.
PMP
Bearing track of the tilt function
•
Lightly grease the bearing track with LONGTIME PD2.
PMP
Tilt spindle
•
Lightly grease the tilt spindle with LONGTIME PD2.
PMP
Ball bearing guides
•
Lightly grease the ball bearing guides with LONGTIME PD2.
PMP
Toothed gears
•
Lightly grease the toothed gears of the potentiometer drive (r103), with LONGTIME PD2.
2.5.3
Rotation drive
PMP
Spindle (Uroskop D2/D3 only)
•
Grease the rotation drive spindle with LONGTIME PD2.
2.5.4
Longitudinal table drive
PMP
Rails
•
Clean the guide rails and lightly grease them with silicon paste.
2.5.5
Spotfilm device
PMP
Cleaning
•
Clean the entire spotfilm device inside, where accessible.
2.5.6
System general
PMP
Contrast agent residues
•
Remove any contrast agent residues and other contamination from points on the system
normally not accessible to the customer.
PMP
Cables and hoses
•
Clean all accessible cables and hoses.
UROSKOP D
Inspection and maintenance
RLL5-310.101.02
Page 10 of 16
Rev. 02
01.97
TDSP 1
Siemens AG
Medical Engineering