Ricoh Container Stacker Unpacking & Setup Instructions - Page 33
Browse online or download pdf Unpacking & Setup Instructions for Printer Accessories Ricoh Container Stacker. Ricoh Container Stacker 49 pages.
8. Connect the AF cable of 4 pin white and 20 pin black connectors and coming
from the Container Stacker 2 to the connectors CN9 and CN10 of the Finisher.
(Connection 1 and 2 on the illustration below)
NOTE
Put the cable through opening "A" of Container Stacker 2.
On SW1 mounted on the CPXXX P/K of the Printer, set switch No. 5 and
No. 8 to ON and set switch No. 2 to OFF.
Printer
9. Install the Rear Covers of the Printer, Container Stacker 2 and Standard Finisher.
Install the connecting cover between the Container Stacker and the Standard
Finisher.
1-28
Container Stacker Installation Instructions
:
Disconnection 1
(4 pin white)
70/92 ppm
184 ppm: Connect the CS Relay Cable
(see Page 19 Step 21).
AF Cable
Opening A
Container Stacker 2
(with Throughpath)
Disconnection 2
(2 pin white)
Connection 2
(20 pin black)
Standard
Finisher
Connection 1
(4 pin white)