Cisco 12016 Unpacking Instructions Manual - Page 7
Browse online or download pdf Unpacking Instructions Manual for Network Router Cisco 12016. Cisco 12016 28 pages. Blower module and air filter for cisco 12016, cisco 12416, and cisco 12816 router
Also for Cisco 12016: Datasheet (9 pages), Instructions Manual (16 pages), Replacement Instructions Manual (32 pages), Replacement Instructions Manual (18 pages)
The five accessory boxes include:
•
•
•
•
The side walls of the shipping container are formed by two U-shaped, interlocking
corrugated panels. The panels overlap to form the narrow ends of the container
and are locked together by 12 plastic locking clips inserted into holes in the
corrugated panels. Two foam inserts fit around the top of the router to act as a
protective cushion and add rigidity to the packaging scheme by serving as a fixed
buffer between the router, the corrugated side walls of the shipping container, and
the corrugated top cap that holds the side walls in place. With the corrugated top
cap installed, the entire shipping package is double-strapped end-to-end and
side-to-side to secure the shipping container and its contents to the pallet.
Do not destroy the components of the shipping package. After installing the
Note
router, reassemble and store one complete router shipping package so that you can
remove the router from the equipment rack and repackage the router in the event
it must be shipped to another site or—if necessary—returned to the factory.
If you do not receive the items you ordered, contact a Cisco customer service
representative for assistance.
78-16081-02
One box that contains the rack-mounting platform, which must be installed in
the equipment rack before inserting the router.
One box that contains two optional center-mount rack-mounting brackets.
Two boxes that contain the two vertical cable-management troughs, which are
installed on either side of the router after it has been installed in the
equipment rack.
One box that contains the remaining small accessory items, including:
The plastic front cover for the power shelf and upper blower module
–
(removed and packaged separately to allow the two foam inserts to be
fitted around the top of the router).
Enhanced models of the 12016 series routers ship with their front
Note
door in place.
–
Printed copies of the customer documents that ship with the router.
Miscellaneous small hardware needed to install the router.
–
Cisco 12016, Cisco 12416, and Cisco 12816 Router Unpacking Instructions
System Unpacking Overview
7