Argo SDIBS9DC Installation Instructions Manual - Page 10

Browse online or download pdf Installation Instructions Manual for Air Conditioner Argo SDIBS9DC. Argo SDIBS9DC 19 pages. Split air conditioner system
Also for Argo SDIBS9DC: Operating Instructions Manual (15 pages), Operating Instructions Manual (17 pages)

EN
Remove the electrical box cover to operate on the
M
terminal strip.
Predispose the condensate drain pipe and attach it
O
to the fan hausing if necessary.
Predispose the terminals of the wire to connect to
N
the terminal strip and connect them. (See electric
wiring to connect).
Secure inter-unit wire using the supplied clamp.
Loose wiring may cause the terminal to overheat
or result in unit malfunction.
A fire hazard may also exist. Therefore, be sure
all wiring is tightly connected.
When closing the electrical component box, take
care not to leave part of the wires out or let them
get caught between the lid and the unit. Check
to see that the tab is aligned, then tighten the
screw.
Install the condensate drain to the outside with a
P
positive slope.
10
WARNING