Argo ULISSE ECO Installation Manual - Page 8
Browse online or download pdf Installation Manual for Air Conditioner Argo ULISSE ECO. Argo ULISSE ECO 14 pages. Room air conditioner with remote condenser
Also for Argo ULISSE ECO: Operating Instructions Manual (16 pages)
Insert the flexible tube into the hole drilled in the
G
wall. Place the unit against the wall, if necessary,
EN
adjust the four antivibration supports in order to
keep the unit levelled.
NOTES:
• The four antivibration supports are rubber
made and they could mark the floor; in this
case the application of proper material under
the support is recommended or use the sup-
plied felt pads.
WARNING
When you assemble the outside unit, follow the
described succession: first, connect the pipes
for frigorific connection, then the electric con-
nector.
Drill the holes and fix the support to the wall using
I
the rawl plugs.
Connect the condensate plastic tube and the
M
electric connector.
• When you move the unit,
never tilt it, to avoid dam-
aging the floor.
The unit can be placed on a balcony or hanged
H
to the wall using the support bracket kit (not sup-
plied).
Remove the plastic plugs from quick couplings,
L
connect the couplings by hand, then tighten using
the torque wrenches (tightening torque 150 ÷ 165
kgcm).
Fix the coupling cover of the outdoor unit and seal
N
the hole in the wall around the flexible tube.
8