Cisco APP-LSS Installing And Upgrading - Page 21

Browse online or download pdf Installing And Upgrading for Network Hardware Cisco APP-LSS. Cisco APP-LSS 32 pages. Fddi card and appliques

The ribbon cables from your FDDI applique are labeled as follows:
FDDI A through D for the first applique
FDDI E through H for the second applique
FDDI I through L for the third applique
FDDI M through P for the fourth applique
Connect the four applique ribbon cables to the C2FCIT card as follows.
Caution
To prevent twisting the ribbon cables and causing a possible short circuit, individually
route each cable (from the FDDI applique) under the main card cage through the space provided and
then up to the corresponding C2FCIT card connector.
Connect the applique ribbon cable P3 A, E, I or M (the second cable from the left in
Step 1
Figure 15) to the 26-pin connector labeled FDDI A, E, I, or M on the left front edge of the
C2FCIT card shown in Figure 14.
Step 2
Connect the applique ribbon cable P2 B, F, J, or N (the second cable from the right in
Figure 15) to the 26-pin connector labeled FDDI B, F, J, or N in Figure 14.
Connect the applique ribbon cable P1 C, G, K, or O (the far-right cable in Figure 15) to the
Step 3
26-pin connector labeled FDDI C, G, K, or O in Figure 14.
Connect the applique ribbon cable P4 D, H, L, or P (the far-left cable in Figure 15) to the
Step 4
far-right (16-pin) connector labeled FDDI D, H, L, or P in Figure 14.
Table 4
FDDI Applique Ribbon Cable and CSC-C2FCIT Connector Designations
FDDI Ribbon
From
Cable
Connector
FDDI A, E, I, or M
P3
FDDI B, F, J, or N
P2
FDDI C, G, K, or O P1
FDDI D, H, L, or P
P4
Figure 14
Orientation of the FDDI Connectors on the CSC-C2FCIT Card
FDDI A, E, I, M
To CSC-C2FCIT
Connector
FDDI A, E, I, or M
Serial
FDDI B, F, J, or N
PROM
FDDI C, G, K, or O
U34
FDDI D, H, L, or P
FDDI B, F, J, N FDDI C, G, K, O
Installing and Upgrading the CSC-C2FCIT FDDI Card and Appliques
Installing Cards and Appliques
Microcode
EPROM
U32
FDDI D, H, L, P
21