Cisco UCS B200 M3 Installation Manual - Page 18

Browse online or download pdf Installation Manual for Network Hardware Cisco UCS B200 M3. Cisco UCS B200 M3 34 pages. Blade server
Also for Cisco UCS B200 M3: Installation And Service Note (36 pages), Installation And Service Note (37 pages), Manual (8 pages), Upgrade Manual (21 pages), Installation And Service Note (28 pages)

Cisco UCS B200 M3 Installation Manual
Procedure
Step 1
(Optional) If you are installing a CPU in a socket that had been shipped empty, there will be a protective cap intended to
prevent bent or touched contact pins. The pick and pull cap tool provided can be used in a manner similar to a pair of
tweezers. Grasp the protective cap and pivot as shown.
Figure 13: Protective Cap Removal
Step 2
Release the catch on the pick and place tool by pressing the handle/button.
Step 3
Remove the new CPU from the packaging, and load it into the pick and place tool as follows:
a) Confirm that the pedestal is set up correctly for your processor. The pedestal ships configured with the markings
"LGA2011-R0" facing upward, and this is the correct orientation.
b) Place the CPU on the pedestal. The CPU corners should fit snugly at the pedestal corners and the notches should meet
the pegs perfectly.
c) Place the CPU pick and place tool on the CPU pedestal aligned with the A1 arrow pointing to the A1 registration mark
on the pedestal.
d) Press the button/handle on the tool to grasp the CPU.
18