Argos Portabase Assembly Instructions - Page 4

Browse online or download pdf Assembly Instructions for Indoor Furnishing Argos Portabase. Argos Portabase 4 pages.

Argos Portabase Assembly Instructions
Assembly: 10x6 & 10x8 OSB Floor ONLY
* Addition to assembly,
Once base has been assembled
attach remaining two beams to
the front and back of base.
Line up the beam with the front
of the base attach using 4x 70mm
screws pre-drilling with a 2mm
drill bit, equally seperate the screws.
Pre-Drill with
2mm bit