Clarke CPSB200 Operation & Maintenance Instructions Manual - Page 6
Browse online or download pdf Operation & Maintenance Instructions Manual for Power Tool Clarke CPSB200. Clarke CPSB200 20 pages. Pressurised sandblaster
ASSEMBLY
FIT THE PRESSURE GAUGE TO THE TANK
1.
Screw the pressure gauge onto
the sandblaster as shown in Fig 1.
• PTFE Tape may be required to
give a perfect seal.
FIT THE HANDLE BARS TO THE TANK
1.
Lay the tank on a flat level surface
(such as a workbench or table
top), with the handlebar mounting
brackets facing up, as shown in Fig
2.
• Handlebars are labelled "LEFT"
and "RIGHT."
2. Align the holes in the left
handlebar with the handlebar
mounting brackets on the left side
of the tank.
3. Place a washer onto each of the four handlebar mounting screws. Insert a
screw through each of the holes in handlebar and mounting brackets,
4. Place a nut onto each of the screws and firmly tighten in place with a
wrench.
5. Repeat steps 2-4 for the right handlebar.
6
Fig 1
Fig 2