Zanussi ZGG 782 Instruction Booklet - Page 10

Browse online or download pdf Instruction Booklet for Hob Zanussi ZGG 782. Zanussi ZGG 782 20 pages. Zanussi gas hobs instruction booklet

Zanussi ZGG 782 Instruction Booklet

Installation

IMPORTANT
This hob must be installed by a competent
person to the relevant Gas Standards.
Any gas installation must be carried out by a
registered competent person.
The manufacturer will not accept liability, should
the above instructions or any of the other safety
instructions incorporated in this book be
ignored.
Gas Connection
Connection to the gas supply should be with either rigid
or semi-rigid pipe, i.e. steel or copper.
The connection should be suitable for connecting to RC
1/2 (1/2 BSP male thread).
When the final connection has been made, it is essential
that a thorough leak test is carried out on the hob and
installation. Ensure that the main connection pipe does
not exert any strain on the hob.
It is important to install the elbow correctly, with
the shoulder on the end of the thread, fitted to the
hob connecting pipe.
Failure to ensure the correct assembly will cause
leakage of gas.
Cut Out Size
The dimensions of the cut-out are given in the diagram.
FO 2098
10
WHEN THE HOB IS FIRST INSTALLED
On the end of the shaft, which includes the GJ 1/2"
threaded elbow, adjustment is fixed so that the washer
is fitted between the components as shown in the
diagram. Screw the parts together without using excessive
force.
FO 0264
Rectangular cut-out size for hob
Dimensions are given in mm.
ZGG 642
FO 2038
Once the hob has been installed, it is important
to remove any protective materials, which were
put on in the factory.
A) End of shaft with nut
B) Washer
C) Elbow
FO 0814
ZGG 782