3M 710 Instructions Manual - Page 11
Browse online or download pdf Instructions Manual for Projector 3M 710. 3M 710 20 pages. Splicing rig
Also for 3M 710: Brochure & Specs (4 pages), Specifications (4 pages)
5.3 Wrap the group to be spliced with the conductor
group holder. Dress the pairs over the colored peaks
with the conductor ends exiting towards the color
code guide. Do not pull the conductors tight to the
back of the connector. Use the error tester tool to
check for correct conductor placement.
5.4 Push the "T" bar forward and down until contact
is made with the conductors. Pull the handle down
to the stop, seating and cutting the conductors in
the bridge module. Remove the excess conductors.
Engage the handle into the retaining clip, pull the
"T" bar up, and place into the open position.
5.5 Place a cap on the module body. Use finger pressure
to push down the cap to pre-engage it to the module
body. The cap latches should face the color code
guide.
5.6 Pull the "T" bar up above the cap. Push the "T" bar
forward and down until contact is made with the cap.
Pull the handle down to the stop, seating the cap into
the bridge module body. Engage the handle into the
retaining clip, pull the "T" bar up, and place into the
open position. The 25-pair bridge splice module is
complete.
78-815-304--E
11