ASG TLB-PS61 Operation Manual - Page 5

Browse online or download pdf Operation Manual for Power Supply ASG TLB-PS61. ASG TLB-PS61 5 pages.

ASG TLB-PS61 Operation Manual

Warranty

The warranty is 1 year after delivery. If any troubles should occur, please contact ASG.
In the following cases, the purchaser shall pay for parts and labor regardless of the
terms of warranty:
Failure due to improper handling.
Failure due to product modification or improper processing.
Failure due to causes beyond control (for example earthquake or fire).
Consumables, replaceable parts, and replacement work expenses.

Steps to Switch Voltage

1. Turn power off and unplug power supply. Find the voltage switch on the backside
of power supply.
2. Release both screws and take out the protective cover.
3. Move the switch to the correct voltage.
ASG, Division of Jergens, Inc.
S. Waterloo Road | Cleveland, OH
15700
44110-3898
| Phone: (
| Fax: (
| Email: [email protected] | Web: www.asg-jergens.com | Revision Date: 01/03/18
888) 486-6163
216) 481-4519
Steps to Switch Voltage
4. Replace the protective cover and re-tighten both screws.
5