ASGCO CHEVRON Installation, Operation & Maintenance Instructions Manual - Page 7
Browse online or download pdf Installation, Operation & Maintenance Instructions Manual for Ultrasonic Jewelry Cleaner ASGCO CHEVRON. ASGCO CHEVRON 12 pages. Belt cleaners
Chevron
Installation
ASGCO Mfg., Inc.
5. Burn or drill a 1" diameter hole at each of the "X" points on both chute
walls.
6. Insert a ¾" x 2" long bolt into each of the 1" diameter holes. Be sure to
insert the bolts from the outside of the chute wall, then place a nut and
washer on each bolt from the inside. Only hand tighten the nuts at this
time.
7. Tack weld the heads of each of the bolts on both sides of the chute wall.
When all of the bolt heads have been welded, the Chevron
installation can begin. Start with the last shaft installation and
work forward toward the head pulley.
1.
Install a Chevron mounting bracket on each of the bolts. To do
this, loosen the nut, slide the bracket into position, then snug up
the nut by hand tightening. Be sure that the top of the bracket
(the part with two notches) is facing up as shown.
2.
Position a Chevron shaft on top of the facing mounting brackets.(The
pillow block and bearing are shipped already mounted on the shaft.)
Fasten both pillow blocks to the bracket with 3/8" X 1½" long bolts and
hardware (flat washer, locking washer, and nut). [Don't worry about the
direction of the discs at this point.
Head Pulley
Chevron Mounting Brackets
Chute Walls
Pillow
Conveyor Belt
Block
Chevron Mounting Bracket
Chute Wall
GO TO PAGE 9
6
CHEVRON