ASGCO CHEVRON Installation, Operation & Maintenance Instructions Manual - Page 8

Browse online or download pdf Installation, Operation & Maintenance Instructions Manual for Ultrasonic Jewelry Cleaner ASGCO CHEVRON. ASGCO CHEVRON 12 pages. Belt cleaners

Vibro Band and
Bearing Cover
Installation
ASGCO Mfg., Inc.
Before installing the remaining Chevron shafts, the Vibro Band must be
located and installed on this shaft. Proceed as follows:
1. Position a Vibro Band mounting bracket on each side of the chute wall.
The bracket should be located with its top edge approximately 1" below
the belt and perpendicular to the ground (not the belt). The notched
end of the bracket should face up toward the belt and the center of the
chute.
IMPORTANT: There should be a 2" distance between the Vibro Band
mounting bracket and Chevron discs.
Chute Wall
Vibro Band
2. Weld the Vibro Band mounting brackets into position.
3. Take one of the Vibro Bands and hold it up to but not touching the belt
while resting it against the front of the brackets. From the back, mark
the two slot locations on the plastic. Drill a ½" diameter hole at the
bottom of the slot location on each side.
4. Install the Vibro Band on the side of the mounting bracket facing the
head pulley with two 3/8" X I" long bolts and hardware. Adjust it so that
it just kisses the belt across the full width.
CAUTION: The Vibro Bands do not provide cleaning action; their function
is to direct the scraped material away from the next Chevron
and direct it down into the chute. Adjusting the Vibro Bands too
tightly will cause premature wear.
Vibro Band
Mounting Bracket
10
CHEVRON