Dowco V324SE Installatie-instructies - Pagina 3

Blader online of download pdf Installatie-instructies voor {categorie_naam} Dowco V324SE. Dowco V324SE 5 pagina's. 2019 g3 full / front enclosure / double canopy

STEP 4
Replace the brackets. Insert a 1 3/4" bolt from the top through the bracket and the rail. Place a barrel nut on each bolt and tighten (Figure 2).
STEP 5
Follow the same procedure for the other side.
FIG. 2
CAUTION
TO PREVENT DAMAGE TO THE TOP RAIL, IT IS RECOMMENDED TO DRILL A PILOT HOLE FIRST.
AUXILLARY BOW
FIG. 3
SECONDARY BOW
RAIL
Dowco Marine, Inc. | 1610 Frisco Road, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
3
SIDE ASSEMBLY
AFT
DECK BUTTON DETAIL
1
CROWN
D
4
C
2
B
A
BOW
MAIN BOW
5
HOLD DOWN ARM
140305-00 | 06/18