Dowco V324SE Installatie-instructies - Pagina 5
Blader online of download pdf Installatie-instructies voor {categorie_naam} Dowco V324SE. Dowco V324SE 5 pagina's. 2019 g3 full / front enclosure / double canopy
FIG. 5
AFT CURTAIN)S)
NOTE:
THE GATE CURTAINS (IF YOUR PURCHASE CONTAINS THEM) GO BETWEEN THE BOW SIDE CURTAIN AND THE AFT SIDE CURTAINS.
INSTALLING SCEW STUD FASTENERS (FIGURE 5)
STEP 1
Make sure all curtains are zipped together.
STEP 2
Start with the aft side curtains. Make sure the lower front corner of both
curtains hang the same distance from the door opening. Mark the location
of the nearest snap (A) on the aluminum rail and install the stud.
STEP 3
Find the last snap (B) on the same side. You may have to adjust the curtain
bottoms by pulling the curtains taut so they appear smooth along the rail.
You do not want the curtains to appear "wavy". Mark and install the stud.
STEP 4
Find the first snap (C) on the same side. Install the remaining studs.
CARE
WARNING
DO NOT TRAILER BOAT WITH ANY CANOPY TOP UP (IN RADAR ARCH POSITION) OR WITH THE ENCLOSURE ASSEMBLED!
Dowco Marine, Inc. | 1610 Frisco Road, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
AFT SIDE CURTAIN
BOW SIDE CURTAIN
(PORT)
AFT CANOPY
AFT SIDE CURTAIN
BOW SIDE CURTAIN
(STARBOARD)
B
PORT
AFT
STARBOARD
B
(PORT)
BOW CANOPY
BOW CURTAIN(S)
(STARBOARD)
A
DOOR
TYPICAL OVERHEAD VIEW
DOOR
A
C
DOOR
BOW
C
140305-00 | 06/18