AddEnergie SmartDC V2 Installatiehandleiding - Pagina 9
Blader online of download pdf Installatiehandleiding voor {categorie_naam} AddEnergie SmartDC V2. AddEnergie SmartDC V2 15 pagina's. V2
Site Preparation
7
1'11"
58,4 cm
3'6"
106,7 cm
1 . The station must be installed on a concrete slab .
2 . The surface of the concrete slab must be large enough to install both the station, and the protective bollards, and
still have enough space for users to circulate . The above figure shows the ideal dimensions and distances to
respect .
3 . The slab's thickness must be a minimum of 6 inches, and must come equipped with a metal mesh to reinforce it .
4 . The ground underneath the slab must be properly drained and stabilized (as required), so that it is not affected by
freezing .
5 . An electric conduit of appropriate diameter (based on the electric wire gauge) must bring the electric cable under
the station's perimeter, preferably in the forward-left zone under the station's perimeter .
6 . The conduit must not protrude from the surface of the concrete slab by more than 1 inch (2 .5 cm) .
*IMPORTANT: If there is a wall behind the station, there must be 16 inches of space between them .
2017 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
2'3"
68,6 cm
78,4 cm
9"
/ 22,8 cm
Optimal output zone for the
Zone optimale de sortie
Zone optimale de sortie
du conduit électrique
electric conduit
du conduit électrique
Optimal output zone for the
76,2 cm
electric conduit
2'6"
76,2 cm
213,4 cm
2'7"
2'3"
68,6 cm
6"
/ 15,2 cm
Station's perimeter
Périmètre de la Borne
Périmètre de la Borne
2'6"
Station's perimeter
2'6"
76,2 cm
7'0"
6'0"
182,9 cm
9