Duratuf KIWI MK2A Montagehandleiding - Pagina 13

Blader online of download pdf Montagehandleiding voor {categorie_naam} Duratuf KIWI MK2A. Duratuf KIWI MK2A 16 pagina's.
Ook voor Duratuf KIWI MK2A: Montagehandleiding (18 pagina's)

Duratuf KIWI MK2A Montagehandleiding
Step 5: Bottom Door Guide: Slide Door to corner. Hang
Door Guide (108) on bottom of the Door. Make it
flush with Corner Flashing. Lift up approximately
3mm so that the Door will Slide freely. Pre-drill
hole and nail in place using a 50mm nail. Slide to
centre. Ensuring Door slides freely, pre-drill hole
and nail Door Guide in place. Check Door is not
binding in the middle then pre-drill holes into
each Rib at similar spacing into Door Step Flash-
ing. Nail off using 50mm nails.
Note:
For sheds with Raised Base Plate option the
Door Step Flashing will protrude down past the
Bottom Plate. Attach Door Guide with rivets.
Step 1: Position Barge Flashing (A102) on gable
ends. Position a Spouting (B103) and rivet
to the Barge Flashing at each end. Repeat
with other Spouting.
MK2A DOOR
MK2A BARGE & SPOUTING
DOOR
GUIDE
Step 2: Centralise Barge Flashing on gable end
and rivet in place, one rivet into every
second Rib. Fit two rivets through top of
Barge into Rib. Repeat with other Barge
Flashing. Check Spoutings are straight,
then rivet to Roof one rivet every second
Rib.
13
CLADDING
BOTTOM
PLATE
DOOR