Contempo PFM (SWB) Installatiehandleiding - Pagina 6

Blader online of download pdf Installatiehandleiding voor {categorie_naam} Contempo PFM (SWB). Contempo PFM (SWB) 10 pagina's. C-thru model 42

2.
Determine where the combustion air supply will be in the fireplace chase, then select the side
unit with the vent tube penetration(LS). Apply refractory mastic to the area on the base(B)
where this piece will set on then set this first side in place.
3.
Right Side
3.
Repeat the above procedure to set the second side(RS). It is necessary to stabilize these
two pieces before adding any additional pieces. This is accomplished by cutting a piece of
½" plywood or wafer board to 52"x32" and placing it over both side pieces, line up with the base
and plum one side, then using 2" deck screws, screw the board to the firebox. Repeat on the
other side.
4.
Next apply "Flue Goo" to the top of both vertical sides (LS and RS) where the Top Back (TB)
will be set. Now lift this piece into place.
5.
TF
Top Front
5.
Repeat above procedure for Top Front (TF) piece.
6.
Apply "Flue Goo" to the vertical edges of the Top Right (TR) piece and on the top of the Right
Side piece (RS). Now place the Top Right (TR) piece in place, aligned with the front piece (TF)
and screw the lower lag bolt through the front piece (TF) into the Top Right (TR) piece.
Repeat procedure for the Top Left (TL) piece.
Plywood / Waferboard
RS
4.
Top Back
6.
TL
Top Right/Top Left
7
TB
TR
Lag Bolts