Durr Dental VISTACAM2 Handleiding voor installatie en gebruik - Pagina 8
Blader online of download pdf Handleiding voor installatie en gebruik voor {categorie_naam} Durr Dental VISTACAM2. Durr Dental VISTACAM2 13 pagina's.
4
5
6
20
INSTALLATION
5. SET UP
5.1 Room set-up
• The room temperature must not fall below +
10 ° C in winter and in the summer must not
rise above + 40 ° C.
• Installation in wet or damp rooms is
prohibited.
5.2 Setup options
• The Docking-station may be installed
together with the VistaCam2 on a cupboard
or on a trolley.
• Wall mounting.
• Mounting on a support of the treatment unit.
• On the side of a VistaCart.
6. INSTALLATION
X
6.1 Horizontal set up
When installing horizontally on a cupboard or
on the VistaCart first stick the rubber feet
pads in the position marked.
6.2 Mounting plate
In order that the VistaCam2 is securely fixed
to the Docking-station when mounting on the
wall, on a pipe or on the VistaCart the
mounting plate must first be fixed to the front
edge.
Procedure:
• Remove screw (X).
• Place mounting plate in position.
• Screw into place.
6.3 Wall mounting
Screw the Docking-station onto the wall using
the screws and rawlplugs supplied. When
connecting the VistaCam2 and the Docking-
station together take care that the front cover
plate of ther Docking-station is placed under
the prefitted mounting plate and the
VistaCam2 is firmly held in position.
When mounting in this position do not
attach the rubber foot pads of the
Docking-station, otherwise the front
rail of the Docking-station will not lie
flush.