76 PROJECTS ASSBAG Montage - Pagina 2

Blader online of download pdf Montage voor {categorie_naam} 76 PROJECTS ASSBAG. 76 PROJECTS ASSBAG 2 pagina's. Anti strap system top tube bag

BAG SLIDER - BAG SIDE
Align bracket with flat edge toward the
front.
Insert spine washer inside bag.
Puncture through chosen holes and
install screws using allen key.
BIKE SLIDER - BIKE SIDE STICK ON
APPLY IN A WARM, DRY ENVIRONMENT. ENSURE SURFACES & HANDS ARE GREASE FREE.
HAIR DRYER. MEASURE TWICE, STICK ONCE! CURE FOR 24 HOURS.
Apply adhesive pad firmly
Slide onto bag.
pressing all areas.
(Removal may require alot of force)
BIKE SLIDER - BIKE SIDE DIRECT MOUNT
Push out hole plugs using a blunt tool.
Secure in place using supplied
screws and 3mm allen key.
Place on bike. Mark a line.
Mark a centre line on top
tube.
Slide bracket off (may require alot of force)
For non uniform and narrow
tubes we advise to hold in
place with tape whilst
curing.
REMOVE BY GENTLY HEATING WITH A
Peel back film, align front
edge and press firmly.
Ensure alignment, pull
away the rest of the film
and press firmly.